Case study | Structural Engineering

18-1038.05 PTB 187-9 I-74 over Salt Fork Vermillion River Phase II Bridge

Details


Owner

Illinois Department of Transportation

Client

Illinois Department of Transportation

Project Cost

$18 Million

Status

Estimated Completion Fall 2022

Summary

Kaskaskia Engineering Group, LLC (KEG) provided Phase II engineering services to the Illinois Department of Transportation (IDOT), District 5, for completing a Plans, Specifications, and Cost Estimate for the rehabilitation of I-74 bridges over the Salt Fork Vermillion River west of Danville in Vermilion County, Illinois.

Project

The original structures were both constructed in 1962 and have undergone a series of various rehabilitation work in 1977, 1991, and between 2006 and 2017. The proposed rehabilitation includes superstructure replacement, substructure repairs, pier repairs, abutment retrofitting, and increased clear width.

KEG developed the Phase II Plans, Contract Specifications, and Cost Estimates for the project.  The Illinois Department of Transportation provided the structural design for the two structures to be replaced, while KEG prepared the typical sections, summary, and schedules of quantities, removal plans, drainage design, removal plans maintenance of traffic, guardrail design, erosion control pavement marking plans and cross-sections.

See More Case Studies

20-1067 Bluff Road BUILD Grant Application

20-1067 Bluff Road BUILD Grant Application

16-1032 Decatur 2016 TIGER Grant Application

16-1032 Decatur 2016 TIGER Grant Application

15-1009.01 2015 City of Belleville STP Application – West Main Street

15-1009.01 2015 City of Belleville STP Application – West Main Street

14-1016 East St. Louis Rivers Edge Redevelopment Zone

14-1016 East St. Louis Rivers Edge Redevelopment Zone

10-1038.03 Moline Multimodal Station TIGER II Grant

10-1038.03 Moline Multimodal Station TIGER II Grant

10-1038.02 Rockford Intermodal Station TIGER II Grant

10-1038.02 Rockford Intermodal Station TIGER II Grant

18-1009.06 Fort Kaskaskia and Fort de Chartres State Historic Site Improvements

18-1009.06 Fort Kaskaskia and Fort de Chartres State Historic Site Improvements

17-1076 Bicentennial Park Improvements

17-1076 Bicentennial Park Improvements

14-1013 Stookey Township Bike Trail Feasibility Study

14-1013 Stookey Township Bike Trail Feasibility Study

13-1052 West Belleville Bike Trail Phase II

13-1052 West Belleville Bike Trail Phase II

12-1019 Powerton Lake SWFA Boat Access and Parking Lot Improvements

12-1019 Powerton Lake SWFA Boat Access and Parking Lot Improvements

10-1078.02 Kimball Plaza at Bicentennial Park

10-1078.02 Kimball Plaza at Bicentennial Park

18-1009.10 PTB 186-13 Rock Cut State Park Improvements

18-1009.10 PTB 186-13 Rock Cut State Park Improvements

19-1075 Walnut Hill Cemetery Niche

19-1075 Walnut Hill Cemetery Niche

18-1042 Rainstorm Express Car Wash, O’Fallon, IL

18-1042 Rainstorm Express Car Wash, O’Fallon, IL

17-1054 Satori 800 Development

17-1054 Satori 800 Development

13-1043 Menard Correctional Center – Building Demolition

13-1043 Menard Correctional Center – Building Demolition

09-1064.01 U.S. Army Corps of Engineers Dam and Levee Inspection

09-1064.01 U.S. Army Corps of Engineers Dam and Levee Inspection

07-0023 Belleville Parks Master Plan

07-0023 Belleville Parks Master Plan

07-0002 US 30 from Illinois 136 to Illinois 40

07-0002 US 30 from Illinois 136 to Illinois 40

19-1065 Evansville, Indiana Signal Emergency Vehicle Preemption

19-1065 Evansville, Indiana Signal Emergency Vehicle Preemption

15-1063 PTB 177-15 Traffic Data Collection – IDOT Districts 4, 6, & 8 Bridge

15-1063 PTB 177-15 Traffic Data Collection – IDOT Districts 4, 6, & 8 Bridge

20-1135.03 Helibase Site Development Task Order

20-1135.03 Helibase Site Development Task Order

20-1121.00 Anway Trail and 2 Mile Creek Bridge Replacements

20-1121.00 Anway Trail and 2 Mile Creek Bridge Replacements

20-1069.03 USACE Brandon Road Interbasin

20-1069.03 USACE Brandon Road Interbasin

20-1035 University of Illinois – Springfield Soccer Field

20-1035 University of Illinois – Springfield Soccer Field

19-1125.01  Sangchris Lake State Park Percolation Test

19-1125.01 Sangchris Lake State Park Percolation Test

19-1040.00  Lamping Dam Geotechnical Investigation

19-1040.00 Lamping Dam Geotechnical Investigation

18-1070 F.A.U. 1504 (55th Street) – Wolf Road to Brainard Avenue

18-1070 F.A.U. 1504 (55th Street) – Wolf Road to Brainard Avenue

18-1030.00 Reagan Mem.Tollway (I-88) Windsor Dr. Bridge Replacement

18-1030.00 Reagan Mem.Tollway (I-88) Windsor Dr. Bridge Replacement

18-1016.00  MoDOT Route 6 Bridge Replacements

18-1016.00 MoDOT Route 6 Bridge Replacements

18-1009.01  Fox Ridge State Park Slope Analysis

18-1009.01 Fox Ridge State Park Slope Analysis

17-1102.01 MnDOT (SP 8680-173) I-94 Reconstruction TH24 to Monticello Bridge

17-1102.01 MnDOT (SP 8680-173) I-94 Reconstruction TH24 to Monticello Bridge

17-1101.00 MnDOT Metro District Soil Borings

17-1101.00 MnDOT Metro District Soil Borings

17-1063 MnDOT (SP 7005-121) TH 169 and TH 41 Road Reconstruction Bridge

17-1063 MnDOT (SP 7005-121) TH 169 and TH 41 Road Reconstruction Bridge

17-1001.00  Fort McCoy – Reserve Pay Mission & Fitness Center

17-1001.00 Fort McCoy – Reserve Pay Mission & Fitness Center

15-1062.00  PTB 177-09 Pinecrest Drive over I-74

15-1062.00 PTB 177-09 Pinecrest Drive over I-74

12-2064  Lemay Pump Station No.1 Redundant Force Main Tunnel

12-2064 Lemay Pump Station No.1 Redundant Force Main Tunnel

12-1031.05 MSD-BCMM FF-16 Schuetz – Phase II

12-1031.05 MSD-BCMM FF-16 Schuetz – Phase II

20-1140.00 Regional Pedestrian Safety Action Plan

20-1140.00 Regional Pedestrian Safety Action Plan

20-1127.00-.02 Kautz Road Widening and Reconstruction

20-1127.00-.02 Kautz Road Widening and Reconstruction

20-1049 MoDOT Southeast District Overlays

20-1049 MoDOT Southeast District Overlays

20-1043.06 I-69 Ditching and Clipping Field Work

20-1043.06 I-69 Ditching and Clipping Field Work

19-1146 PTB 193-44 Traffic Data Collection Districts 2, 4, and 5 Bridge

19-1146 PTB 193-44 Traffic Data Collection Districts 2, 4, and 5 Bridge

19-1137.04 IDOT PTB 193-16 Value Engineering Study, I-190 at O’Hare Airport

19-1137.04 IDOT PTB 193-16 Value Engineering Study, I-190 at O’Hare Airport

19-1137.01 Touhy Avenue ADA corners from IL 72 to US 14

19-1137.01 Touhy Avenue ADA corners from IL 72 to US 14

19-1081 PTB 192-026 Signal Coordination and Timing – IDOT Districts 8 & 9 Bridge

19-1081 PTB 192-026 Signal Coordination and Timing – IDOT Districts 8 & 9 Bridge

19-1062 St. Mary’s Road Neil Street to 4th Street

19-1062 St. Mary’s Road Neil Street to 4th Street

19-1032.00 West Main Street Improvements, Belleville, IL

19-1032.00 West Main Street Improvements, Belleville, IL

19-1015 Business 50 Reconstruction, Washington, IN

19-1015 Business 50 Reconstruction, Washington, IN

18-1082.01 I-65 Added Travel Lanes

18-1082.01 I-65 Added Travel Lanes

18-1071.02 PTB 188-16 IL 50 at Armour Road Phase II

18-1071.02 PTB 188-16 IL 50 at Armour Road Phase II

18-1067 Rondo Land Bridge Feasibility Study

18-1067 Rondo Land Bridge Feasibility Study

17-1109.09 INDOT 1704-08 I-65 Pipe Lining

17-1109.09 INDOT 1704-08 I-65 Pipe Lining

17-1102.02 MnDOT GEC WO2 US 59 TH 1 Reconstruction

17-1102.02 MnDOT GEC WO2 US 59 TH 1 Reconstruction

17-1052.00 Edens Spur Tollway Reconstruction

17-1052.00 Edens Spur Tollway Reconstruction

16-1120.01 I-64 Widening Traffic Management Plan Project Report Bridge

16-1120.01 I-64 Widening Traffic Management Plan Project Report Bridge

15-1048 PTB 176-34 Long Range State Transportation Plan

15-1048 PTB 176-34 Long Range State Transportation Plan

14-1078 Fourth Street, St. Mary’s to Kirby Avenue

14-1078 Fourth Street, St. Mary’s to Kirby Avenue

20-1009.00 MoDOT Bridges A8989 and A8990, New Madrid County

20-1009.00 MoDOT Bridges A8989 and A8990, New Madrid County

19-1103 Centralia Correctional Center

19-1103 Centralia Correctional Center

17-1047 METRO Blue Line Extension (Bottineau)

17-1047 METRO Blue Line Extension (Bottineau)

16-1132.00 MoDOT Route K and Route N Bridges, Stoddard County

16-1132.00 MoDOT Route K and Route N Bridges, Stoddard County

18-1006 I-74 over Oak/Market Street Rehabilitation (PTB 186-09)

18-1006 I-74 over Oak/Market Street Rehabilitation (PTB 186-09)

18-1038.05 PTB 187-9 I-74 over Salt Fork Vermillion River Phase II  Bridge

18-1038.05 PTB 187-9 I-74 over Salt Fork Vermillion River Phase II Bridge

17-1033.02 Fifth Street SE Pedestrian Bridge of 35W

17-1033.02 Fifth Street SE Pedestrian Bridge of 35W

09-0006  Various Bridge Repairs, IDOT District 4

09-0006 Various Bridge Repairs, IDOT District 4

08-0026 I-70 New Mississippi River Bridge

08-0026 I-70 New Mississippi River Bridge

19-1156.01 Bloomington Safe Routes to School PESA

19-1156.01 Bloomington Safe Routes to School PESA

19-1128 MnDOT TH 13 Improvements

19-1128 MnDOT TH 13 Improvements

19-1014.04 INDOT 1901-10 Bridge Deck Overlay on SR 25  Over Wabash River

19-1014.04 INDOT 1901-10 Bridge Deck Overlay on SR 25 Over Wabash River

18-1091 Kickapoo Rail Trail – Phase II-B

18-1091 Kickapoo Rail Trail – Phase II-B

18-1055 Emerson Avenue Traffic Noise Analysis

18-1055 Emerson Avenue Traffic Noise Analysis

18-1028.00 I-64 over Ohio River Bridge (Sherman Minton Bridge)

18-1028.00 I-64 over Ohio River Bridge (Sherman Minton Bridge)

18-1005.03 IDOT PTB 186-02 111th Street at I-94 (Bishop Ford Expressway)

18-1005.03 IDOT PTB 186-02 111th Street at I-94 (Bishop Ford Expressway)

17-1073.00 MET Council Park and Ride Planning Study and Model Update

17-1073.00 MET Council Park and Ride Planning Study and Model Update

17-1044 MNDOT I-35 I-90 Weigh Station

17-1044 MNDOT I-35 I-90 Weigh Station

16-1129 Milwaukee East-West BRT Corridor Study

16-1129 Milwaukee East-West BRT Corridor Study

16-1062.00 Normal Uptown Station Pedestrian Tunnel

16-1062.00 Normal Uptown Station Pedestrian Tunnel

16-1008.01 I-70 Added Travel Lanes

16-1008.01 I-70 Added Travel Lanes

15-1027.00 Florence Bridge Environmental Assessment

15-1027.00 Florence Bridge Environmental Assessment

12-1031.33 South County Sanitary Relief

12-1031.33 South County Sanitary Relief

10-1043 PTB 154.06 Illinois Route 83 and Illinois Route 137

10-1043 PTB 154.06 Illinois Route 83 and Illinois Route 137

14-1057.02 Scott Air Force Base Perimeter Fence

14-1057.02 Scott Air Force Base Perimeter Fence

10-1013  I-70 over New Mississippi River Bridge Construction  Inspection

10-1013 I-70 over New Mississippi River Bridge Construction Inspection

19-1102.01 Raab Avenue Construction Inspection

19-1102.01 Raab Avenue Construction Inspection

18-1057 Galesburg Traffic Signal Modernization

18-1057 Galesburg Traffic Signal Modernization

17-1092 PTB 184.016 Various Construction Inspection Projects, IDOT D3

17-1092 PTB 184.016 Various Construction Inspection Projects, IDOT D3

16-1005 Metra Positive Train Control (PTC)

16-1005 Metra Positive Train Control (PTC)

2015 City of Belleville STP Application – West Main Street

2015 City of Belleville STP Application – West Main Street

Lebanon Avenue – F Street to IL 161 STP Application

Lebanon Avenue – F Street to IL 161 STP Application

Lebanon Avenue TAP Grant Application

Lebanon Avenue TAP Grant Application

East St. Louis 10th & 20th Street Community Development Block Grant

East St. Louis 10th & 20th Street Community Development Block Grant

Shrine of Our Lady of the Snows Annexation

Shrine of Our Lady of the Snows Annexation

A Street STP Application

A Street STP Application

Sierra Park – Shiloh, IL

Sierra Park – Shiloh, IL

Signal Hill Bike Trail

Signal Hill Bike Trail

South Pump Station at Carlyle Lake Fish and Wildlife Area

South Pump Station at Carlyle Lake Fish and Wildlife Area

Stephen A. Forbes State Park – Dump and Fish Cleaning Stations

Stephen A. Forbes State Park – Dump and Fish Cleaning Stations

Burdette Park Campground

Burdette Park Campground

Alton and East St. Louis Station Location Evaluation

Alton and East St. Louis Station Location Evaluation

I-270 over Chain of Rocks Canal

I-270 over Chain of Rocks Canal

Wagner Buick GMC Location Justification Report

Wagner Buick GMC Location Justification Report

Mid-America Medical District Infrastructure Analysis

Mid-America Medical District Infrastructure Analysis

Six Mile Library Regional Renovation

Six Mile Library Regional Renovation

Old National Events Center (The Centre) ADA Assessment

Old National Events Center (The Centre) ADA Assessment

St. John’s Lutheran School – Red Bud, IL

St. John’s Lutheran School – Red Bud, IL

City of Belleville Public Building Improvements

City of Belleville Public Building Improvements

SIUC – Fire Alarm Systems Replacement

SIUC – Fire Alarm Systems Replacement

St. Louis Housing Authority, Lafayette Tiffany Rehab

St. Louis Housing Authority, Lafayette Tiffany Rehab

Administrative Offices of the Emergency Telephone System

Administrative Offices of the Emergency Telephone System

East Washington Street Parking Lot

East Washington Street Parking Lot

Reagan Memorial Tollway (I-88) E/W Connector Reconstruction

Reagan Memorial Tollway (I-88) E/W Connector Reconstruction

Caulks Creek Phase I Trunk Sewer

Caulks Creek Phase I Trunk Sewer

Davenport Transload Facility

Davenport Transload Facility

US 50 and Shattuc Road Realignment

US 50 and Shattuc Road Realignment

IL-29 Extension from IL Route 6 to Cedar Hills Drive

IL-29 Extension from IL Route 6 to Cedar Hills Drive

IL-13 over BNSF Railroad and Marathon Drive

IL-13 over BNSF Railroad and Marathon Drive

I-64 over Wabash River

I-64 over Wabash River

Ameren MGP Site Centralia, IL

Ameren MGP Site Centralia, IL

Gateway Digestive and Liver Center

Gateway Digestive and Liver Center

North Green River Road

North Green River Road

SWIC Metrolink Improvements

SWIC Metrolink Improvements

Shawnee National Forest Rock Stabilization

Shawnee National Forest Rock Stabilization

Various Projects IDOT District 3

Various Projects IDOT District 3

East Riverfront Interlocking

East Riverfront Interlocking

US 136 over IL 336

US 136 over IL 336

Urbana West Airport Road

Urbana West Airport Road

Environmental NEPA Oversight 2014

Environmental NEPA Oversight 2014

IL Route 47 Categorical Exclusion II & Noise Study

IL Route 47 Categorical Exclusion II & Noise Study

Strother Road Individual Permit

Strother Road Individual Permit

I-74 and I-57 Interchange Noise Study

I-74 and I-57 Interchange Noise Study

I-64 at Rieder Road Environmental Study

I-64 at Rieder Road Environmental Study

Florence Bridge Feasibility Study

Florence Bridge Feasibility Study

US 20 106 Report

US 20 106 Report

Chick-fil-A Traffic Impact Study, Sunset Hills

Chick-fil-A Traffic Impact Study, Sunset Hills

Safe Routes to School Program Evaluation and Modification

Safe Routes to School Program Evaluation and Modification

Value Engineering Study FAI-74 and FAI-57 Champaign, IL

Value Engineering Study FAI-74 and FAI-57 Champaign, IL

I-64 at Rieder Road Access Justification Report

I-64 at Rieder Road Access Justification Report

Traffic Data Collection – IDOT   Districts 4, 6, and 8

Traffic Data Collection – IDOT Districts 4, 6, and 8

IL Route 3 & Olive Street Traffic Impact Study

IL Route 3 & Olive Street Traffic Impact Study

Alton Regional Multi-Modal Transportation Center

Alton Regional Multi-Modal Transportation Center

Allen Road at IL Route 6 Traffic Signal & Signing Plan

Allen Road at IL Route 6 Traffic Signal & Signing Plan

SmartSensor Advance/Wavetronix System Signal Upgrades

SmartSensor Advance/Wavetronix System Signal Upgrades

Windsor Road at I-57 Bridge Approach QA/QC Peer Review

Windsor Road at I-57 Bridge Approach QA/QC Peer Review

14th Street And Trendley Avenue Reconstruction

14th Street And Trendley Avenue Reconstruction

Fourth Street Improvements, University of Illinois

Fourth Street Improvements, University of Illinois

Daniel Boone Bridge Design-Build Project

Daniel Boone Bridge Design-Build Project

I-74 and I-155 Interchange

I-74 and I-155 Interchange

I-64 at Rieder Road – Phase II

I-64 at Rieder Road – Phase II

McClintock Avenue from Mascoutah Avenue to Carlyle Avenue

McClintock Avenue from Mascoutah Avenue to Carlyle Avenue

Long Range State Transportation Plan

Long Range State Transportation Plan

Belleville Comprehensive Plan

Belleville Comprehensive Plan

Carrollton Bank – Jerseyville Branch

Carrollton Bank – Jerseyville Branch

St. Clair County Building Demo Plans

St. Clair County Building Demo Plans

Various Bridge Inspections on I-255

Various Bridge Inspections on I-255

I-74 Over I-155

I-74 Over I-155

Lenzburg Road Bridge

Lenzburg Road Bridge

Townline Road Reconstruction

Townline Road Reconstruction

Eckert’s Orchard Expansion

Eckert’s Orchard Expansion

IL-13 At Freeburg Avenue Roundabout

IL-13 At Freeburg Avenue Roundabout

Get In Touch

Send us a message and we will get back to you as soon as possible.

(618) 233-5877 

We have created a network of offices across the Midwest to serve our clients and partners.