Case study | Transportation Engineering

Daniel Boone Bridge Design-Build Project

Details


Owner

Missouri Department of Transportation

Client

Burns & McDonnell, Inc.

Project Cost

$125 Million

Status

Estimated Completion 2016

Summary

The Missouri Highways and Transportation Commission selected the team of Walsh Construction Co. of Chicago and J.S. Alberici Construction Co. Inc., of St. Louis to be the design-build contractor for the new Daniel Boone Bridge over the Missouri River and related work. The lead design firm was Burns & McDonnell Inc., along with several subconsultants. Kaskaskia Engineering Group, LLC (KEG) served as one of the DBE subconsultant to Burns & McDonnell.  KEG was the lead designer on all roadway improvements associated with the bridge construction.   

Project

The project’s primary purpose was to replace a deficient bridge with a new Missouri River bridge connecting St. Charles and St. Louis Counties. The $125 million project also included removal of the deteriorated westbound span built in 1935; improvements to the existing eastbound span, which opened in 1989; a new Chesterfield Airport Road interchange, including connecting the North Outer Road to the westbound Interstate 64 on-ramp; and building a continuous westbound fourth lane from the Chesterfield Airport Road entrance ramp to the Highway 94 exit ramp.  These improvements provide eight lanes, four in each direction, for 3 miles between Chesterfield Airport Road and Highway 94.  The project also added a shared-use path on the new span connecting the Katy Trail in St. Charles County to the Monarch Levee Trail in St. Louis County.

The project also added a shared-use path on the new span connecting the Katy Trail in St. Charles County to the Monarch Levee Trail in St. Louis County.

KEG staff designed improvements to I-64, Ramps 1 and 2 at I-64, the Spirit of St. Louis Boulevard, and the North Outer Road to Ramp 2.  Highway design included typical sections and plans, profiles, and cross-sections.  Horizontal and vertical geometry, super elevation, and guardrail/barrier design were also included.  KEG designed and coordinated signing and striping plans and the erosion and sediment control plans for the project.

The entire project team including MoDOT staff, contractors, and design consultants worked together in a project office located just outside the project limits to make this a successful project for all.

Construction of the new eastbound span of the Daniel Boone Bridge is now complete and open to traffic.

See More Case Studies

Troy O’Fallon Road Bridge Replacement

Troy O’Fallon Road Bridge Replacement

Center for Academic and Vocational Excellence (CAVE)

Center for Academic and Vocational Excellence (CAVE)

Bryant Avenue South Reconstruction

Bryant Avenue South Reconstruction

Bluff Road BUILD Grant Application

Bluff Road BUILD Grant Application

Decatur 2016 TIGER Grant Application

Decatur 2016 TIGER Grant Application

2015 City of Belleville STP Application – West Main Street

2015 City of Belleville STP Application – West Main Street

East St. Louis Rivers Edge Redevelopment Zone

East St. Louis Rivers Edge Redevelopment Zone

Moline Multimodal Station TIGER II Grant

Moline Multimodal Station TIGER II Grant