Case study | Geographic Information Systems

Belleville Parks Master Plan

Details


Owner

City of Belleville, Illinois

Client

City of Belleville, Illinois

Project Cost

$50,000 (Study Fee)

Status

Completed April 2008

Summary

Kaskaskia Engineering Group, LLC (KEG) prepared a Park, Open Space, and Greenway/Trails Plan for the City of Belleville which expressed the community’s vision, needs, and priorities for leisure space, services, and facilities. This document currently serves as a guide for local policy formulation and a plan for upgrading parks and trails.

Project

Using GIS mapping, KEG developed a comprehensive inventory of each existing park and recreation facility within the City of Belleville and within a one-mile radius surrounding the City.  Private parks, trails, and significant private recreation areas were also inventoried. The inventory recorded information relative to accessibility, acreage, site characteristics, facilities utilization, and immediate maintenance needs. A GIS map utilizing parcel-based information provided by the City was prepared and layered to indicate the different types and classifications of parks and trail facilities. Mapping also indicated significant natural/open space areas, such as floodplains and wetlands, which have the potential for recreational use or may be suitable for the development of a trail and greenway system. GIS was also used to identify large tracts of land to be utilized for a proposed 100+ acre park.

Based on the findings of the data, additional recreational facilities to meet the needs of residents, tourists, and visitors, and a network of bicycle and pedestrian routes linking city parks, schools, and activity centers were recommended.  The bicycle trail plan incorporated future connections with regional existing and proposed trails. The master park plan included streetscape work for the entrance of parks, lighting, landscaping, and pedestrian facilities.  Traffic calming measures were employed to integrate vehicle, bicycle, and pedestrian needs at parks adjacent to heavy traffic roadways.

Our approach to the planning and design process was to achieve a balance between the benefits and opportunities of facilities and the cost of their development and operations. This was accomplished by involving stakeholders including residents of Belleville, members of a selected Parks and Recreation Advisory Board, and elected City officials throughout the planning process.   Input from the public (gathered from public information meetings, interactive website surveys, citizen groups, small group workshops, and leisure surveys) and from Parks and Recreation Department staff was received and assimilated by the team and translated into recommendations for the acquisition of land, improvements to existing facilities, and development of new facilities. A financing and implementation program was developed, including a capital improvements program, and a draft version is presented to all stakeholders prior to the formal adoption process.

See More Case Studies

Troy O’Fallon Road Bridge Replacement

Troy O’Fallon Road Bridge Replacement

Center for Academic and Vocational Excellence (CAVE)

Center for Academic and Vocational Excellence (CAVE)

Bryant Avenue South Reconstruction

Bryant Avenue South Reconstruction

Bluff Road BUILD Grant Application

Bluff Road BUILD Grant Application

Decatur 2016 TIGER Grant Application

Decatur 2016 TIGER Grant Application

2015 City of Belleville STP Application – West Main Street

2015 City of Belleville STP Application – West Main Street

East St. Louis Rivers Edge Redevelopment Zone

East St. Louis Rivers Edge Redevelopment Zone

Moline Multimodal Station TIGER II Grant

Moline Multimodal Station TIGER II Grant

Rockford Intermodal Station TIGER II Grant

Rockford Intermodal Station TIGER II Grant

Fort Kaskaskia and Fort de Chartres State Historic Site Improvements

Fort Kaskaskia and Fort de Chartres State Historic Site Improvements

Bicentennial Park Improvements

Bicentennial Park Improvements

Stookey Township Bike Trail Feasibility Study

Stookey Township Bike Trail Feasibility Study

West Belleville Bike Trail Phase II

West Belleville Bike Trail Phase II

Powerton Lake SWFA Boat Access and Parking Lot Improvements

Powerton Lake SWFA Boat Access and Parking Lot Improvements

Kimball Plaza at Bicentennial Park

Kimball Plaza at Bicentennial Park

PTB 186-13 Rock Cut State Park Improvements

PTB 186-13 Rock Cut State Park Improvements

Walnut Hill Cemetery Niche

Walnut Hill Cemetery Niche

Rainstorm Express Car Wash, O’Fallon, IL

Rainstorm Express Car Wash, O’Fallon, IL

Satori 800 Development

Satori 800 Development

Menard Correctional Center – Building Demolition

Menard Correctional Center – Building Demolition

U.S. Army Corps of Engineers Dam and Levee Inspection

U.S. Army Corps of Engineers Dam and Levee Inspection

Belleville Parks Master Plan

Belleville Parks Master Plan

US 30 from Illinois 136 to Illinois 40

US 30 from Illinois 136 to Illinois 40

Evansville, Indiana Signal Emergency Vehicle Preemption

Evansville, Indiana Signal Emergency Vehicle Preemption

PTB 177-15 Traffic Data Collection – IDOT Districts 4, 6, & 8 Bridge

PTB 177-15 Traffic Data Collection – IDOT Districts 4, 6, & 8 Bridge

Mark Twain National Park Helibase

Mark Twain National Park Helibase

Anway Trail and 2 Mile Creek Bridge Replacements

Anway Trail and 2 Mile Creek Bridge Replacements

USACE Brandon Road Interbasin

USACE Brandon Road Interbasin

University of Illinois – Springfield Soccer Field

University of Illinois – Springfield Soccer Field

Sangchris Lake State Park Percolation Test

Sangchris Lake State Park Percolation Test

Lamping Dam Geotechnical Investigation

Lamping Dam Geotechnical Investigation

F.A.U. 1504 (55th Street) – Wolf Road to Brainard Avenue

F.A.U. 1504 (55th Street) – Wolf Road to Brainard Avenue

Reagan Mem.Tollway (I-88) Windsor Dr. Bridge Replacement

Reagan Mem.Tollway (I-88) Windsor Dr. Bridge Replacement

MoDOT Route 6 Bridge Replacements

MoDOT Route 6 Bridge Replacements

Fox Ridge State Park Slope Analysis

Fox Ridge State Park Slope Analysis

MnDOT (SP 8680-173) I-94 Reconstruction TH24 to Monticello Bridge

MnDOT (SP 8680-173) I-94 Reconstruction TH24 to Monticello Bridge

MnDOT Metro District Soil Borings

MnDOT Metro District Soil Borings

MnDOT (SP 7005-121) TH 169 and TH 41 Road Reconstruction Bridge

MnDOT (SP 7005-121) TH 169 and TH 41 Road Reconstruction Bridge

Fort McCoy – Reserve Pay Mission & Fitness Center

Fort McCoy – Reserve Pay Mission & Fitness Center

PTB 177-09 Pinecrest Drive over I-74

PTB 177-09 Pinecrest Drive over I-74

Lemay Pump Station No.1 Redundant Force Main Tunnel

Lemay Pump Station No.1 Redundant Force Main Tunnel

MSD-BCMM FF-16 Schuetz – Phase II

MSD-BCMM FF-16 Schuetz – Phase II

Regional Pedestrian Safety Action Plan

Regional Pedestrian Safety Action Plan

Kautz Road Widening and Reconstruction

Kautz Road Widening and Reconstruction

MoDOT Southeast District Overlays

MoDOT Southeast District Overlays

I-69 Ditching and Clipping Field Work

I-69 Ditching and Clipping Field Work

PTB 193-44 Traffic Data Collection Districts 2, 4, and 5 Bridge

PTB 193-44 Traffic Data Collection Districts 2, 4, and 5 Bridge

IDOT PTB 193-16 Value Engineering Study, I-190 at O’Hare Airport

IDOT PTB 193-16 Value Engineering Study, I-190 at O’Hare Airport

Touhy Avenue ADA corners from IL 72 to US 14

Touhy Avenue ADA corners from IL 72 to US 14

PTB 192-026 Signal Coordination and Timing – IDOT Districts 8 & 9 Bridge

PTB 192-026 Signal Coordination and Timing – IDOT Districts 8 & 9 Bridge

St. Mary’s Road Neil Street to 4th Street

St. Mary’s Road Neil Street to 4th Street

West Main Street Improvements, Belleville, IL

West Main Street Improvements, Belleville, IL

Business 50 Reconstruction, Washington, IN

Business 50 Reconstruction, Washington, IN

I-65 Added Travel Lanes

I-65 Added Travel Lanes

PTB 188-16 IL 50 at Armour Road Phase II

PTB 188-16 IL 50 at Armour Road Phase II

Rondo Land Bridge Feasibility Study

Rondo Land Bridge Feasibility Study

INDOT 1704-08 I-65 Pipe Lining

INDOT 1704-08 I-65 Pipe Lining

MnDOT GEC WO2 US 59 TH 1 Reconstruction

MnDOT GEC WO2 US 59 TH 1 Reconstruction

Edens Spur Tollway Reconstruction

Edens Spur Tollway Reconstruction

I-64 Widening Traffic Management Plan Project Report Bridge

I-64 Widening Traffic Management Plan Project Report Bridge

PTB 176-34 Long Range State Transportation Plan

PTB 176-34 Long Range State Transportation Plan

Fourth Street, St. Mary’s to Kirby Avenue

Fourth Street, St. Mary’s to Kirby Avenue

MoDOT Bridges A8989 and A8990, New Madrid County

MoDOT Bridges A8989 and A8990, New Madrid County

Centralia Correctional Center

Centralia Correctional Center

METRO Blue Line Extension (Bottineau)

METRO Blue Line Extension (Bottineau)

MoDOT Route K and Route N Bridges, Stoddard County

MoDOT Route K and Route N Bridges, Stoddard County

I-74 over Oak/Market Street Rehabilitation (PTB 186-09)

I-74 over Oak/Market Street Rehabilitation (PTB 186-09)

PTB 187-9 I-74 over Salt Fork Vermillion River Phase II  Bridge

PTB 187-9 I-74 over Salt Fork Vermillion River Phase II Bridge

Fifth Street SE Pedestrian Bridge of 35W

Fifth Street SE Pedestrian Bridge of 35W

Various Bridge Repairs, IDOT District 4

Various Bridge Repairs, IDOT District 4

I-70 New Mississippi River Bridge

I-70 New Mississippi River Bridge

Bloomington Safe Routes to School PESA

Bloomington Safe Routes to School PESA

MnDOT TH 13 Improvements

MnDOT TH 13 Improvements

INDOT 1901-10 Bridge Deck Overlay on SR 25  Over Wabash River

INDOT 1901-10 Bridge Deck Overlay on SR 25 Over Wabash River

Kickapoo Rail Trail – Phase II-B

Kickapoo Rail Trail – Phase II-B

Emerson Avenue Traffic Noise Analysis

Emerson Avenue Traffic Noise Analysis

I-64 over Ohio River Bridge (Sherman Minton Bridge)

I-64 over Ohio River Bridge (Sherman Minton Bridge)

IDOT PTB 186-02 111th Street at I-94 (Bishop Ford Expressway)

IDOT PTB 186-02 111th Street at I-94 (Bishop Ford Expressway)

MET Council Park and Ride Planning Study and Model Update

MET Council Park and Ride Planning Study and Model Update

MNDOT I-35 I-90 Weigh Station

MNDOT I-35 I-90 Weigh Station

Milwaukee East-West BRT Corridor Study

Milwaukee East-West BRT Corridor Study

Normal Uptown Station Pedestrian Tunnel

Normal Uptown Station Pedestrian Tunnel

I-70 Added Travel Lanes

I-70 Added Travel Lanes

Florence Bridge Environmental Assessment

Florence Bridge Environmental Assessment

South County Sanitary Relief

South County Sanitary Relief

PTB 154.06 Illinois Route 83 and Illinois Route 137

PTB 154.06 Illinois Route 83 and Illinois Route 137

Scott Air Force Base Perimeter Fence

Scott Air Force Base Perimeter Fence

I-70 over New Mississippi River Bridge Construction  Inspection

I-70 over New Mississippi River Bridge Construction Inspection

Raab Avenue Construction Inspection

Raab Avenue Construction Inspection

Galesburg Traffic Signal Modernization

Galesburg Traffic Signal Modernization

PTB 184.016 Various Construction Inspection Projects, IDOT D3

PTB 184.016 Various Construction Inspection Projects, IDOT D3

Metra Positive Train Control (PTC)

Metra Positive Train Control (PTC)

2015 City of Belleville STP Application – West Main Street

2015 City of Belleville STP Application – West Main Street

Lebanon Avenue – F Street to IL 161 STP Application

Lebanon Avenue – F Street to IL 161 STP Application

Lebanon Avenue TAP Grant Application

Lebanon Avenue TAP Grant Application

East St. Louis 10th & 20th Street Community Development Block Grant

East St. Louis 10th & 20th Street Community Development Block Grant

Shrine of Our Lady of the Snows Annexation

Shrine of Our Lady of the Snows Annexation

A Street STP Application

A Street STP Application

Sierra Park – Shiloh, IL

Sierra Park – Shiloh, IL

Signal Hill Bike Trail

Signal Hill Bike Trail

South Pump Station at Carlyle Lake Fish and Wildlife Area

South Pump Station at Carlyle Lake Fish and Wildlife Area

Stephen A. Forbes State Park – Dump and Fish Cleaning Stations

Stephen A. Forbes State Park – Dump and Fish Cleaning Stations

Burdette Park Campground

Burdette Park Campground

Alton and East St. Louis Station Location Evaluation

Alton and East St. Louis Station Location Evaluation

I-270 over Chain of Rocks Canal

I-270 over Chain of Rocks Canal

Wagner Buick GMC Location Justification Report

Wagner Buick GMC Location Justification Report

Mid-America Medical District Infrastructure Analysis

Mid-America Medical District Infrastructure Analysis

Six Mile Library Regional Renovation

Six Mile Library Regional Renovation

Old National Events Center (The Centre) ADA Assessment

Old National Events Center (The Centre) ADA Assessment

St. John’s Lutheran School – Red Bud, IL

St. John’s Lutheran School – Red Bud, IL

City of Belleville Public Building Improvements

City of Belleville Public Building Improvements

SIUC – Fire Alarm Systems Replacement

SIUC – Fire Alarm Systems Replacement

St. Louis Housing Authority, Lafayette Tiffany Rehab

St. Louis Housing Authority, Lafayette Tiffany Rehab

Administrative Offices of the Emergency Telephone System

Administrative Offices of the Emergency Telephone System

East Washington Street Parking Lot

East Washington Street Parking Lot

Reagan Memorial Tollway (I-88) E/W Connector Reconstruction

Reagan Memorial Tollway (I-88) E/W Connector Reconstruction

Caulks Creek Phase I Trunk Sewer

Caulks Creek Phase I Trunk Sewer

Davenport Transload Facility

Davenport Transload Facility

US 50 and Shattuc Road Realignment

US 50 and Shattuc Road Realignment

IL-29 Extension from IL Route 6 to Cedar Hills Drive

IL-29 Extension from IL Route 6 to Cedar Hills Drive

IL-13 over BNSF Railroad and Marathon Drive

IL-13 over BNSF Railroad and Marathon Drive

I-64 over Wabash River

I-64 over Wabash River

Ameren MGP Site Centralia, IL

Ameren MGP Site Centralia, IL

Gateway Digestive and Liver Center

Gateway Digestive and Liver Center

North Green River Road

North Green River Road

SWIC Metrolink Improvements

SWIC Metrolink Improvements

Shawnee National Forest Rock Stabilization

Shawnee National Forest Rock Stabilization

Various Projects IDOT District 3

Various Projects IDOT District 3

East Riverfront Interlocking

East Riverfront Interlocking

US 136 over IL 336

US 136 over IL 336

Urbana West Airport Road

Urbana West Airport Road

Environmental NEPA Oversight 2014

Environmental NEPA Oversight 2014

IL Route 47 Categorical Exclusion II & Noise Study

IL Route 47 Categorical Exclusion II & Noise Study

Strother Road Individual Permit

Strother Road Individual Permit

I-74 and I-57 Interchange Noise Study

I-74 and I-57 Interchange Noise Study

I-64 at Rieder Road Environmental Study

I-64 at Rieder Road Environmental Study

Florence Bridge Feasibility Study

Florence Bridge Feasibility Study

US 20 106 Report

US 20 106 Report

Chick-fil-A Traffic Impact Study, Sunset Hills

Chick-fil-A Traffic Impact Study, Sunset Hills

Safe Routes to School Program Evaluation and Modification

Safe Routes to School Program Evaluation and Modification

Value Engineering Study FAI-74 and FAI-57 Champaign, IL

Value Engineering Study FAI-74 and FAI-57 Champaign, IL

I-64 at Rieder Road Access Justification Report

I-64 at Rieder Road Access Justification Report

Traffic Data Collection – IDOT   Districts 4, 6, and 8

Traffic Data Collection – IDOT Districts 4, 6, and 8

IL Route 3 & Olive Street Traffic Impact Study

IL Route 3 & Olive Street Traffic Impact Study

Alton Regional Multi-Modal Transportation Center

Alton Regional Multi-Modal Transportation Center

Allen Road at IL Route 6 Traffic Signal & Signing Plan

Allen Road at IL Route 6 Traffic Signal & Signing Plan

SmartSensor Advance/Wavetronix System Signal Upgrades

SmartSensor Advance/Wavetronix System Signal Upgrades

Windsor Road at I-57 Bridge Approach QA/QC Peer Review

Windsor Road at I-57 Bridge Approach QA/QC Peer Review

14th Street And Trendley Avenue Reconstruction

14th Street And Trendley Avenue Reconstruction

Fourth Street Improvements, University of Illinois

Fourth Street Improvements, University of Illinois

Daniel Boone Bridge Design-Build Project

Daniel Boone Bridge Design-Build Project

I-74 and I-155 Interchange

I-74 and I-155 Interchange

I-64 at Rieder Road – Phase II

I-64 at Rieder Road – Phase II

McClintock Avenue from Mascoutah Avenue to Carlyle Avenue

McClintock Avenue from Mascoutah Avenue to Carlyle Avenue

Long Range State Transportation Plan

Long Range State Transportation Plan

Belleville Comprehensive Plan

Belleville Comprehensive Plan

Carrollton Bank – Jerseyville Branch

Carrollton Bank – Jerseyville Branch

St. Clair County Building Demo Plans

St. Clair County Building Demo Plans

Various Bridge Inspections on I-255

Various Bridge Inspections on I-255

I-74 Over I-155

I-74 Over I-155

Lenzburg Road Bridge

Lenzburg Road Bridge

Townline Road Reconstruction

Townline Road Reconstruction

Eckert’s Orchard Expansion

Eckert’s Orchard Expansion

IL-13 At Freeburg Avenue Roundabout

IL-13 At Freeburg Avenue Roundabout